Location Iberian Pyrite Belt, South Portugal
Ownership Exploration license – 100% owned by AVU subsidiary
Size 762.9 km2
Deposit Type Copper-zinc massive sulfide targets
Exploraton Stage Grassroots – Chança target drill-ready; 25 mt past producer @ São Domingos; other targets present
Status JV-ready
Infrastructure
  • Accessible by paved and dirt roads
  • Locally rugged topography
  • Elevation below 500 meters
  • 2-3 hours from Lisbon; 3-4 hours from Seville, Spain
Reports

Mertola Project Summary

 

PHOTOS